We recently finished this small bathroom remodel for some
wonderful friends who were selling their home. The original tub and surround were
never level which caused water leakage at the back corner ledge each time the
shower was used. We replaced the tub and shower stall and hardware,
re-sheetrocked the entire bathroom in moisture proof board, took out the old
medicine cabinet, and replaced the old “Diva” vanity light with a new updated
one. The old vanity was repurposed and repainted by the homeowners and we
installed a new all in one cultured stone vanity top to complete it. The client
painted the walls and staged the new towel holders with white fluffy towels.
The result? The house sold in 5 days!